SNOW PLOWING AND SNOW REMOVAL SERVICES

(contract last updated 11/11/2011)

SCOPE: Contract for snow plowing and removal service.

CONTRACT # DESCRIPTION
09-5074 SNOW PLOWING AND SNOW REMOVAL SERVICES
CONTRACT ORIGIN: ADDITIONAL INFORMATION:
UW-Madison
Purchasing Services
21 N Park St, Ste 6101
Madison, WI 53715-1218
UW-Madison users contact:
Vint Quamme
(608) 262-1147 FAX (608) 262-4467
vquamme@bussvc.wisc.edu
 

Non-UW-Madison users contact: Vendor Representative

RESTRICTED TO: Facilities Planning & Management
COOPERATIVE PURCHASING: NO
CONTRACT TERM: October 1, 2008, through September 30, 2009, with automatic renewal extensions to September 30, 2013, unless amended, cancelled or rebid.

Vendor(s)
027179
Joe Daniels Construction
919 Applegate Road
Madison WI 53713
     
Sales Representative: PHONE # FAX #
Joe Biddick 608-271-4800 608-271-4570
E-mail jbiddick@danielsco.com
  PHONE # FAX #
Ordering/Expediting: 608-271-4800 608-271-4570
Invoice Information: 608-271-4800 608-271-4570
24/7 Direct Line  608-271-4800 608-271-4570
Supplier Diversity Reporting: 608-271-4800 608-271-4570
Website: www.danielsco.com
Commodity Code 968-72
Federal Employee ID # (FEIN) 39-1187059
F.O.B. “V” F.O.B.  SERVICE/MAINTENANCE
Terms: N/30
Delivery: One hour after notification by University
Invoicing: Invoices shall reflect hourly rates, equipment type and hours each piece is used and invoiced by Bid Groups, (except Bid Group 8 which shall show Ramp 75 charges on a separate invoice).
Item Description: SNOW PLOWING & REMOVAL SERVICE per the following Bid Groups.

  • All hourly rates include equipment and operator.
  • Plowing begins only upon UW call to Contractor.
  • All snow must be removed from UW site and hauled to areas designated by the University.
  • Overtime, when approved, shall not exceed 150% of the straight time hourly rate.
Orders: Phone
Other: Pricing not available to:  University of Wisconsin System campuses, State of Wisconsin Agencies or Wisconsin Municipalities.
Pricing: See following Bid Groups:

ITEM

DESCRIPTION

UNIT PRICE

OVERTIME HOURLY

 

BID GROUP 1 -- East Campus:  Parking Lot 1, 34 and Ramp 46, Ramp 29

 

 

1

End loader

$138.50

$153.50

2

Skid loader with rubber blade

$93.50

$108.50

3

4 x 4 Pickup with 7’ rubber bottom plow

$98.50

$113.50

4

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 2 – Kohl Center:  Parking Lot 91

 

 

5

4 x 4 Pickup w/7’ plow

$93.50

$108.50

6

1-ton (single-axle) Dump Truck with  minimum 5-yd. capacity box

$80.00

$95.00

7

Loader/Tractor w/bucket w/10’ reach to load dump truck

$138.50

$153.50

 

 

 

 

 

BID GROUP 3 -- South Campus:  Ramp 17 and Area South of Ramp 17

 

 

8

End loader

$138.50

$153.50

9

Skid loader with rubber blade

$93.50

$108.50

10

4 x 4 Pickup with rubber bottom plow

$98.50

$113.50

11

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 4 - West Campus:  Parking Lot 60 and Lot 85

 

 

12

End loader

$138.50

$153.50

13

Grader

$130.00

$145.00

14

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 5 -- West Campus Annex:  Parking Lot 62

 

 

15

1-ton single-axle truck with 9’ hydro-turn plow

$130.00

$145.00

16

1-ton (single-axle) dump truck with minimum 5-yd. capacity box

$80.00

$95.00

17

Loader/Tractor w/bucket with 10’ reach to load dump truck

$138.50

$153.50

 

 

 

 

 

BID GROUP 6 - Foundation Building:  Parking Lot 41 and Ramps 41W, 20, and 36

 

 

18

4 x 4 Pickup w/7’ plow

$93.50

$108.50

19

4 x 4 Pickup with 7’ rubber bottom plow

$98.50

$113.50

20

Skid loader with rubber blade/bucket and bumpers

$138.50

$153.50

21

1-ton (single-axle) dump truck with minimum 5-yd. capacity box

$80.00

$95.00

22

Loading equipment for Item #21 above

$138.50

$153.50

 

 

 

 

 

BID GROUP 7 – CSC/Hospital:  ER/Ambulance Entrance, Parking Lot 63 and Ramp 95 Entrance, Ramp 79

 

 

23

End loader

$138.50

$153.50

24

Skid loader with rubber blade

$93.50

$108.50

25

4 x 4 Pickup with 7’ plow

$93.50

$108.50

26

4 x 4 Pickup with rubber bottom plow

$98.50

$113.50

27

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 8 -  Ramp 75

 

 

28

End loader

$138.50

$153.50

29

Skid loader with rubber blade

$93.50

$108.50

30

4 x 4 Pickup with 7’ plow

$93.50

$108.50

31

4 x 4 Pickup with rubber bottom plow

$98.50

$113.50

32

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 9 - AFCH Ramp and Entrances

 

 

33

End loader

$138.50

$153.50

34

Skid loader with rubber blade

$93.50

$108.50

35

4 x 4 Pickup with 7’ plow

$93.50

$108.50

36

4 x 4 Pickup with rubber bottom plow

$98.50

$113.50

37

Tandem-axle dump truck

$91.50

$106.50

 

 

 

 

 

BID GROUP 10 - For Hauling As Requested In Any Area

 

 

38

End loader

$138.50

$153.50

39

Tandem-axle dump truck

$91.50

$106.50

 

 

ADDITIONAL CONTRACTOR EQUIPMENT AVAILABLE UPON REQUEST FROM UNIVERSITY

40

Skid loader

$93.50

$108.50

41

Dump truck, single axle

$80.00

$95.00

42

 Dump truck, dual axle

$91.50

$106.50

43

End loader, 2 cu. yd. bucket

$138.50

$153.50

44

End loader, 2-1/2 cu. yd. bucket

$138.50

$153.50

45

End loader, 3 cu. yd. bucket

$138.50

$153.50

46

End loader, 3-1/2 cu. yd. bucket

$138.50

$153.50

47

Grader

$130.00

$145.00

48

4x4 Pickup with plow

$93.50

$108.50

49

Truck with 11’ plow

$130.00

$145.00

50

D-9 Cat tractor with pusher blade

$138.50

$153.50

 

 

 

 

 

OTHER AVAILABLE EQUIPMENT OFFERED

 

 

 

Tri-Axle Dump Truck

$91.50

$106.50

 

Quad-Axle Dump Truck

$91.50

$106.50

SPECIFICATIONS FOR SNOW PLOWING AND SNOW REMOVAL SERVICES

1.         Response Time and Hours of Service:  Service shall be furnished 7 days a week within one hour after notification.  Most plowing and hauling will be performed during early a.m. hours.  Work shall be continuous until all plowing and hauling has been completed.  Under no condition shall work be performed on Saturdays, Sundays or Holidays unless authorized by Snow Operations Manager or designee.  All lots shall be open to parkers by 7:00 a.m. Monday through Friday. 

2.         Pre-Season Snow Management Meeting:  Contractor, when requested, must meet annually with University representatives prior to the snow season to discuss Contract performance in detail.  At this meeting Contractor shall provide names and home phone numbers of all personnel to be contacted by the University’s Snow Operations Manager when Contractor's services are required.  At the same meeting, the University will provide the Contractor, the names and phone numbers of designated snow coordination personnel.  Additional, alternate, or substitute University Snow Operations Managers as needed after the pre-season meeting, shall be identified in writing to the Contractor(s).

3.         Plowing Call-Out: The Snow Operations Manager, or designee, for the Madison campus shall make the initial call-out when the Contractors' services are required for UW-Madison Campus.  Environmental Services or other designated personnel shall monitor the plowing activities.

4.         Contractor Damages:  An annual inspection of areas to look for damages done during snow removal will occur in May of each year.  Contractor shall be responsible for and will be notified by the University of all damage to curbing, parking meters, signs, etc. as it is discovered until the end of the snow season.  At the end of the snow season, the Contractor shall be solely and wholly financially liable for any reported damage and shall comply with the instruction of the Snow Operations Manager in returning University property to its pre-season condition.

5.         Campus Maps:  Maps showing parking lot locations can be viewed at http://www.vip.wisc.edu/map.html.  A campus parking map provides an overview of locations and excerpts from the campus parking atlas supply architectural-style representations drawn to scale and showing total lot, number of stalls, relevant landmarks, light poles, parking meters, and other potential plowing obstacles.  A limited number of newer lots are not yet mapped. 

6 Parking Lot Number & DESCRIPTION
#Stalls
Sq.Yds.
Bid Group number
  ER/Ambulance Entrance
19
2,921
7 CSC/Hospital
  Parking Lot 1
92
3,450
1 East Campus
  Parking Lot 4 Vet Diagnostic Lab
30
3,000
5 West Campus
  Parking Lot 125
10
2,000
5 West Campus
  Parking Lot 17 East (New Surface Section)
65 est
3,400 est
3 South Campus
  Ramp 17
173
5,500 est
3 South Campus
  Area South of Ramp 17
0
3,000 est
3 South Campus
  Parking Lot 18
48
2,400
3 South Campus
  Parking Lot 19
36
4,600
3 South Campus
  Parking Lot 34
265
7,000
1 East Campus
  Parking Lot 41 (Deck to Lot 93 ONLY)
74
5,780
6 Foundation Building
  Ramp 36 (Steenbock)
350
3,396**
6 Foundation Building
  Ramp 46 Southeast Area
91
2,672**
1 East Campus
  Parking Lot 60
1,433
43,101
4 West Campus
  Parking Lot 62
478
20,340
5 West Campus Annex
  Parking Lot 63 (AFCH upper & lower entrance)
42
7,354
9 CSC/Hospital
  Ramp 75 (CSC/Hospital)
865
8,209**
8 CSC/Hospital
  Ramp 76
338
10,000
7 CSC/Hospital
  Parking Lot 76
338
10,000
7 CSC/Hospital
  Parking Lot 79 Surface Section
90
3,871
7 CSC/Hospital
  Parking Lot 85
220
7,000 est.
4 West Campus
  Parking Lot 91
190
8,400
2 Kohl Center
  Parking Lot 93 (S & W of Ramp + 1900 Univ)
24
2,120
6 Foundation Building
  Parking Lot 95 Surface Section
73
3,480
7 CSC/Hospital
  Ramp 17 Level 5 (top level only)
173
5,500
3 South Campus
  Ramp 20 (w/Tip Gate NW) (McArdle)
225
2,917**
6 Foundation Building
  Ramp 29 and surface section
3
726
1 East Campus

*Gate Controlled Lots
**Top Floor sq. yds. Only
*** Windblown snow accumulates in some parking stalls.  In 2007 approximately 30 stalls were affected.

7.         Plowing Priorities:  All lots shall be open to parkers by 7:00 a.m.  Plowing shall be done according to the following numbered order:

            7.1   CSC/Hospital:  First priority is ED Area/Ambulance Entrance, then AFCH parking (Lot 63), then entrance to Lot 79 and 75, then Lot 76 (entrance, exit and top).
            7.2   Lot 60:  Start at west end and work east.  Grader to be parked at Snow Dump Only.
            7.3   Lot 17
            7.4   Lot 1 Memorial Union.
            7.5   Lot 62:  Veterinary Medicine School customer parking and large animal loading area.  This includes Veterinary School Clinic and large animal parking.
            7.6   All remaining Lots and Ramps.

8.         General Plowing Instructions:  The following is subject to change by the University’s Snow Operations Manager.

            Lot #       Instructions
            All Lots    Do not push snow onto islands that have shrubs or trees.  Never push or pile snow into handicapped stalls, access aisles or ramps.
            41            Snow Operations Manager to advise on-site, word-of-mouth, as needed.
            60            Do not push snow to South side of lot on lawn.  Concentrate the snow dumping in a small designated areas instead of a long dump area.
            ER/63      ER/Ambulance area:  Do not pile snow or bank on South side of road or push piles near intersection.  North Lot:  By Handicapped stalls do not plow snow to walkway.
            79            Hospital Patient Lot:  Do not push snow to East side of lot, small trees.

9.         Equipment:
            9.1   Plowing with "shoes" shall not be allowed except as specified in this Bid.  Authorized Environmental Services or Transportation Services personnel may redirect snow removal equipment and personnel to other than originally designated areas and/or may request additional equipment.

            9.2   Representative equipment groupings and a one-hour time-of-use have been assigned.  Actual equipment and time requirements shall be determined as described herein.  Except as designated, bid sections require plowing and hauling as directed by the University’s Snow Operations Manager.

            9.3   Contractor shall also supply a list of firm hourly rates for all additional optional equipment which may be required to meet Contract requirements.  Types of equipment are listed in Itemized Bid List, Bid Group  6.  If Contractor's equipment inventory includes any other equipment, not listed, Bidder shall state hourly rate for that equipment as detailed in Bid Group 6.

10.        Minimum Equipment and Staff.  In order to provide service to meet deadlines during snow removal operations the University requires the Contractor to have the following minimum staff and equipment:

25-28 Staff/Drivers,
8 ea. tri-axle dump trucks,
1 ea. quad-axle dump truck or semi trailer with dump capability,
6-7 front end wheel loaders,
5-6 skid loaders,
2 ea. five yard (approximately) dump trucks,
2 ea. 4 x 4 Pick-up trucks with snow plows, and
1 large tracked mover,. e.g. Caterpillar to move snow on the snow dump pile. 

NOTE:  All Parking Ramps and Parking Lot 34 require the Contractor to use rubber blades on plows.

Contractor shall provide a list of all staff and equipment owned or leased to the Contractor upon request by the University.

The University recommends the following equipment by Lot/Ramp locations as follows.

Minimum Equipment Required for each Lot/Ramp   Parking Lot/Ramp #
Bid Group 1 - East Campus:   Lot 1, Lot 34, Ramp 29 and surface section and Ramp 46 Southeast Area
  2 each, End Loader  
  1 each, Skid loader with rubber blade  
  1 each, 4 X 4 Pickup with 7' rubber bottom plow  
  2 each, Tandem Axle Dump Truck  
Bid Group 2 - Kohl Center:   Lot 91
  1 each, 4 x 4 Pickup with 7' plow  
  1 each, 1-ton (single-axle) dump truck with minimum 5 yard capacity box  
  1 each, Loader/tractor with bucket, w/approx. 10-ft "reach" or equal, sufficient to load 1-ton truck)  
Bid Group 3 - South Campus:   Ramp 17 East new surface section, Lot 18, Lot 19, Ramp 17 and Area South of Ramp
  1 each, 4 x 4 Pickup with rubber bottom plow  
  1 each, End loader  
  1 each, Skid loader with rubber blade (Must be equipped with round, mushroom shaped guides to minimize concrete damage.). Both pieces not greater than 7' high)  
  1 each, Tandem-axle dump truck  
Bid Group 4 - West Campus   Lot 60 and Lot 85
  3 each, End loader (two normally required)  
  1 each, Grader. (Grader to be parked at Snow Dump Only)  
  3 each, Tandem Axle Dump Truck  
Bid Group 5 - West Campus Annex   Lot 4 Vet Diagnostic Lab, Lot 125 and Lot 62
  1 each, 1-ton single axle truck with 9-ft hydro-turn plow  
  1 each, 1-ton (single-axle) dump truck with minimum 5 yard capacity box  
  1 each, Loader/tractor with bucket, w/approx. 10-ft "reach" or equal, sufficient to load 1-ton truck)  
Bid Group 6 - Foundation Building:   Lot 41 West of drive and ramp area and Ramps 20, 36, 41 and 93
  1 each, 4 x 4 Pickup with 7-ft plow  
  1 each, 4 x 4 Pickup with 7 ft. rubber bottom plow  
  1 each, Skid loader with rubber blade/bucket and bumpers (Must be equipped with round, mushroom and shaped guides to minimize concrete damage.). Both pieces not greater than 7' high)  
  1 each, 1-ton (single-axle) dump truck with minimum 5-yd capacity box  
  1 each, Loading equipment for 1-ton (single-axle) dump truck  
Bid Group 7 - CSC/Hospital:   ER/Ambulance Entrance, Lot 76, Lot 79, Lot 95 and Ramp 76
  2 each, End loader  
  2 each, 4 x 4 Pickup with 7 ft. plow  
  1 each, Tandem Axle Dump Truck  
  1 each, Skid loader with rubber blade(Must be equipped with round, mushroom shaped guides to minimize concrete damage.). Both pieces no greater than 7' high)  
  1 each, 4 X 4 Pickup with rubber bottom plow  
Bid Group 8-CSC/Hospital:   Ramp 75
  1 each, End loader  
  1 each, 4 x 4 Pickup with rubber bottom plow  
  1 each, Skid loader with rubber blade (Must be equipped with round, mushroom shaped guides to minimize concrete damage.). Both pieces no greater than 7' high)  
  1 each, 4 X 4 Pickup with 7 ft. plow  
  1 each, Tandem-axle dump truck  
Bid Group 9:   AFCH upper and lower entrance
  1 each, End loader  
  1 each, 4 x 4 Pickup with rubber bottom plow  
  1 each, Skid loader with rubber blade (Must be equipped with round, mushroom shaped guides to minimize concrete damage.). Both pieces no greater than 7' high)  
  1 each, 4 X 4 Pickup with 7 ft. plow  
  1 each, Tandem-axle dump truck  
Bid Group 10 - Hauling:   All Areas
  2 each, Tandem Axle Dump Truck  
  1 each, End loader  

11.        Snow Hauling and Dumping:
            Hauling Snow:  All areas shall have snow removed from site and hauled.  Contractor shall remove all snow piles from parking areas and no snow shall be left within the parking area perimeters. 

            Contractor(s) shall be directed to haul and dispose of snow at on-campus or off-campus sites as directed by Snow Operations Manager.  

            LOT 17 Snow removal time restrictions – No Snow Removal from LOT 17 or surrounding area between 12am and 6am, NO EXCEPTIONS!

            At no time shall the Contractor push, haul or dispose of snow into delineated wetland areas.  If the University discovers that the Contractor did push, haul or dispose of snow into delineated wetland areas, the Contractor shall remove snow without harming the wetland area and move the snow to another approved location at Contractor’s expense. 

            11.1         Hauling: 

  • Ramp 36 (Steenbock) has four (4) levels and has two (2) snow chutes.
  • Ramp 46:  snow chutes are in northeast corner.
  • Parking Lot 60:  Snow must be hauled/removed each day

            11.2         Dumping:  All snow shall be dumped at a location north of the softball field.  Start at corner area near marsh (northwest corner).

12.     Discontinuation of Snow Removal at Parking Lots or Ramps:  In the event a parking lot or ramp is lost or temporarily closed due to construction, the University will, at its discretion, notify the Contractor to suspend or discontinue Snow Plowing/Removal Service for that parking lot or ramp and may remove it from the Contract.


Revision History

AMENDMENT #1 (11/11/11): issued to show price changes effective immediately.  
link to top of document